tools.petrov.re


153 tools in 17 categories. A title opens the tool; the language codes open it in that language.

Nuclear Physics & Radiation 4

Nuclear Engineering, Safety & Fuel 12

Thermodynamics, Heat & Fluid Flow 8

  • Steam Tables (IAPWS-IF97)Thermodynamic properties of water and steam per IAPWS-IF97. Specify any two properties to compute the rest across the saturation and superheated regions, with built-in validation checkpoints.Benchmark tested · 299/299 · Benchmark reportEN UA DE NL FR ES PL
  • Thermodynamic CyclesVapour power and refrigeration cycles — Rankine with reheat or regenerative feedwater heating, and vapour-compression with an internal heat exchanger, two-stage flash economiser or transcritical CO2 — for nine working fluids, plotted on T–s, h–s, lg p–h, lg p–v and T–h diagrams.Benchmark tested · 57/57 · Benchmark reportEN UA DE NL FR ES PL
  • Gas Dynamics LaboratoryExplore Laval nozzles, choking and moving normal shocks, Fanno, Rayleigh, oblique-shock, Prandtl–Meyer and shock-tube flows, plus unsteady 1D Euler transients.Benchmark tested · 257/257 · Benchmark reportEN UA DE NL FR ES PL
  • Mollier i–d / Psychrometric ChartPsychrometric (Mollier i–d) chart for moist air. Plot air states and HVAC processes and read enthalpy, moisture content, dew-point and wet-bulb temperatures.Benchmark tested · 115/115 · Benchmark reportEN UA DE NL FR ES PL
  • 2D Heat TransferInteractive two-dimensional temperature-field model. Define materials and boundary conditions, then inspect temperatures, gradients, isotherms and heat-flow paths.Benchmark tested · 12/12 · Benchmark reportEN UA DE NL FR ES PL
  • Moody Diagram & Pipe FrictionInteractive Moody diagram for internal pipe flow. Set Reynolds number and relative roughness to identify the flow regime and obtain the Darcy friction factor for pressure-loss calculations.Benchmark tested · 145/145 · Benchmark reportEN UA DE NL FR ES PL
  • Pump & Fan Operating PointExplore pump and fan operating points by changing system resistance, speed, density and parallel machines; inspect efficiency, power, NPSH or stability, and where pressure is spent.Benchmark tested · 158/158 · Benchmark reportEN UA DE NL FR ES PL
  • Heat Exchanger CalculatorRating and sizing of plate, wide-gap plate, shell-and-tube, double-pipe, finned air coil and pulsating push-pull exchangers.Benchmark tested · 263/263 · Benchmark reportEN UA DE NL FR ES PL

Pipe & Vessel Transients 10

HVAC & Indoor Climate 11

Acoustics & Noise 2

Building Physics & Envelope 5

Electrical Engineering 6

Control & Systems 9

  • Hydraulic Network SolverDraw an arbitrary network of pipes, nodes, pumps, valves and heat exchangers and solve the steady-state flows and pressures.Benchmark tested · 49/49 · Benchmark reportEN UA DE NL FR ES PL
  • Duct Network SolverDraw arbitrary duct networks with circular or rectangular ducts, junction and tee-loss arms, grilles, dampers and fans.Benchmark tested · 41/41 · Benchmark reportEN UA DE NL FR ES PL
  • Hydraulic Circuit SolutionsTwenty-two standard hydraulic circuits for heating and cooling in four categories — consumer control, generator connection, hydraulic decoupling and pump control…Benchmark tested · 203/203 · Benchmark reportEN UA DE NL FR ES PL
  • Control Loop LaboratoryAssemble a single control loop — setpoint, controller, actuator, plant, sensor, feedback and a disturbance injection — and watch the linear prediction and the non-linear simulation at the same time.Benchmark tested · 55/55 · Benchmark reportEN UA DE NL FR ES PL
  • PLC & DDC Control LabBuild PLC or DDC logic from IEC 61131-3 style blocks, connect it to a virtual tank, zone, valve and pump, inject faults and read the response.Benchmark tested · 114/114 · Benchmark reportEN UA DE NL FR ES PL
  • Functional Description BuilderControl narrative of one system: operating modes, GRAFCET/SFC sequences, control loops, interlocks and alarms, checked for unreachable steps, dead ends, non-deterministic transitions, unknown tags and setpoints outside the instrument range.Benchmark tested · 106/106 · Benchmark reportEN UA DE NL FR ES PL
  • Cause & Effect MatrixBuilds a cause and effect matrix — causes with voting, delay and bypass, effects with safe state, latch and reset — evaluates any cause scenario and reviews every combination for conflicts, coverage, reset and convention gaps.Benchmark tested · 100/100 · Benchmark reportEN UA DE NL FR ES PL
  • I/O ListBuilds a control system's I/O list: tag, signal and electrical type, range, fail state and SIL per signal, then allocates channels to cards and reports counts, spare and findings.Benchmark tested · 159/159 · Benchmark reportEN UA DE NL FR ES PL
  • Functional TestsGenerates one functional test per cause-and-effect cell, voting combination, sequence transition, mode edge and IO loop, records execution with evidence, and measures coverage of the control model.Benchmark tested · 128/128 · Benchmark reportEN UA DE NL FR ES PL

Occupational Safety 18

Project & Delivery 14

Engineering Change & Plant Life 14

CCUS — CO₂ Capture, Transport & Storage 7

Oil, Gas & Hydrogen 24

  • Separator sizingVertical or horizontal gas-liquid separator sizing by the Souders-Brown method (GPSA Section 7, API Spec 12J): allowable gas velocity, vessel diameter, shell height or length, liquid volume and a to-scale sketch.Benchmark tested · 14/14 · Benchmark reportEN UA DE NL FR ES PL
  • Hydrate inhibitionMethanol or glycol injection rate for a required hydrate temperature depression by Hammerschmidt or Nielsen-Bucklin (GPSA Section 20): rich-phase inhibitor fraction, lean solution and pure inhibitor rates, and a rich-phase mass split diagram.Benchmark tested · 14/14 · Benchmark reportEN UA DE NL FR ES PL
  • Erosional velocityErosional velocity of gas, liquid and two-phase production lines by the API RP 14E C-factor equation (5th ed., 1991, reaffirmed 2013): no-slip mixture velocity against Ve = C/√ρm, velocity ratio, minimum inner diameter and a to-scale pipe cross-section.Benchmark tested · 14/14 · Benchmark reportEN UA DE NL FR ES PL
  • Flare radiationThermal radiation from an elevated flare by the API Std 521 Annex C point-source method: flame length, wind tilt, radiation at a receptor, minimum safe distance and stack height, with a grade-level radiation profile.Benchmark tested · 15/15 · Benchmark reportEN UA DE NL FR ES PL
  • Pipeline Corrosion Defect AssessmentWeb calculator that determines failure pressure, safe pressure, estimated repair factor (ERF) and maximum allowable length of single longitudinal corrosion metal-loss defects in oil, gas and hydrogen pipelines using ASME B31G original, modified B31G (0.85dL) and DNV-RP-F101 Part A/B.Benchmark tested · 29/29 · Benchmark reportEN UA DE NL FR ES PL
  • Pipeline Dent Strain CalculatorEstimates dent strain in oil, gas and hydrogen pipelines from measured dent geometry per ASME B31.8-2022 Nonmandatory Appendix R and checks it against acceptance limits.Benchmark tested · 21/21 · Benchmark reportEN UA DE NL FR ES PL
  • Pipeline Cathodic ProtectionSizes galvanic bracelet anodes for coated offshore or buried pipelines per DNV-RP-F103, DNV-RP-B401 and ISO 15589-2, from current demand to anode count.Benchmark tested · 23/23 · Benchmark reportEN UA DE NL FR ES PL
  • CO2 Corrosion Rate CalculatorEstimates CO2 corrosion rates of carbon steel in water-wet oil, gas, hydrogen-blend and CCUS pipelines using de Waard-Milliams 1991 and 1995 models.Benchmark tested · 20/20 · Benchmark reportEN UA DE NL FR ES PL
  • Gas dispersionDownwind distance and width of a continuous gas release to the LFL or a toxic level, using a Gaussian plume (Pasquill-Gifford) or Britter-McQuaid dense gas model.Benchmark tested · 8/8 · Benchmark reportEN UA DE NL FR ES PL
  • Hydrogen jet fireRelease rate, flame length and radiant heat flux of an ignited hydrogen leak, with distances to NFPA 2 and API 521 heat-flux criteria.Benchmark tested · 7/7 · Benchmark reportEN UA DE NL FR ES PL
  • Vapour cloud explosion overpressureSide-on overpressure, duration and impulse of a vapour cloud explosion at a receptor and distances to damage thresholds, by the TNO Multi-Energy and Baker-Strehlow-Tang methods.Benchmark tested · 15/15 · Benchmark reportEN UA DE NL FR ES PL
  • LOPA and SIL targetLayer of protection analysis for one scenario: mitigated frequency, required risk reduction and SIL per IEC 61511-1, and a PFDavg check of a proposed SIF.Benchmark tested · 8/8 · Benchmark reportEN UA DE NL FR ES PL
  • Methane emissions (OGMP 2.0)Annual CH4 inventory of an oil and gas facility from equipment counts, tanks, blowdowns and flaring, with CO2e, methane intensity and OGMP 2.0 level.Benchmark tested · 7/7 · Benchmark reportEN UA DE NL FR ES PL
  • Electrolyser SizingSizes a PEM, alkaline or SOEC electrolysis plant from rated power: polarisation curve, hydrogen output, system kWh/kg and efficiency on LHV and HHV basis, stacks, heat, water and voltage degradation over stack life.Benchmark tested · 16/16 · Benchmark reportEN UA DE NL FR ES PL
  • Blue Hydrogen SMR/ATRMass and energy balance of steam methane reforming or autothermal reforming with CO₂ capture: reformer equilibrium, shift, PSA, natural gas use (LHV), captured and emitted CO₂ and carbon intensity against the 3.38 kg CO₂e/kg low-carbon threshold.Benchmark tested · 16/16 · Benchmark reportEN UA DE NL FR ES PL
  • Hydrogen CompressorSizes a multi-stage intercooled hydrogen compressor with real-gas properties from GERG-2008 (ISO 20765-2:2015) and Leachman (2009): stage ratio, discharge temperatures, intercooler duty, shaft power and kWh per kg.Benchmark tested · 16/16 · Benchmark reportEN UA DE NL FR ES PL
  • Hydrogen Storage VesselSizes a bank of compressed-hydrogen vessels (Types I-IV, EN 17533:2020) with real-gas density from Leachman (2009): usable mass per vessel, number of vessels, ideal-gas error, burst pressure and LHV energy.Benchmark tested · 16/16 · Benchmark reportEN UA DE NL FR ES PL
  • Hydrogen Underground StorageWorking gas, cushion gas, energy (LHV), withdrawal rate and annual throughput of a hydrogen salt cavern from its volume, depth and the lithostatic pressure window (Caglayan et al. 2020), with Leachman (2009) real-gas density.Benchmark tested · 19/19 · Benchmark reportEN UA DE NL FR ES PL
  • LH2 Boil-offBoil-off of a vented liquid hydrogen tank from heat leak and ortho-para conversion (Petitpas, LLNL 2018): initial rate in %/day, mass and LHV energy lost over the storage period, and the para fraction at the end.Benchmark tested · 16/16 · Benchmark reportEN UA DE NL FR ES PL
  • Hydrogen blending into natural gasWobbe index, calorific value and relative density of a natural gas–hydrogen blend by ISO 6976:2016, the EN 16726 H-gas check and the maximum admissible hydrogen fraction.Benchmark tested · 14/14 · Benchmark reportEN UA DE NL FR ES PL
  • Hydrogen carriers compared: LH₂, ammonia, LOHCDelivered cost and energy efficiency of shipping hydrogen as liquid hydrogen, ammonia or LOHC, from conversion to reconversion, versus distance.Benchmark tested · 14/14 · Benchmark reportEN UA DE NL FR ES PL
  • Hydrogen refuelling: vehicle fillMass dispensed, final gas temperature and pressure, fill time and precooling energy of an H70 or H35 vehicle fill, checked against the SAE J2601:2020 limits.Benchmark tested · 14/14 · Benchmark reportEN UA DE NL FR ES PL
  • Hydrogen quantity, energy and fuel qualityConverts hydrogen between kg, Nm³, Sm³ and MWh or GJ (LHV/HHV), gives diesel, petrol, LPG, methanol and natural-gas equivalents with CO₂, and checks ISO 14687:2019 Grade D purity.Benchmark tested · 13/13 · Benchmark reportEN UA DE NL FR ES PL
  • Levelised cost of hydrogen and RFNBO checkLevelised cost of electrolytic hydrogen with cost breakdown, and the RFNBO check under EU delegated regulations 2023/1184 and 2023/1185.Benchmark tested · 20/20 · Benchmark reportEN UA DE NL FR ES PL

Structures & Mechanics 4

  • Beam DiagramsShear-force and bending-moment diagrams for beams. Choose the supports, add point, distributed and triangular loads or applied moments, and read the reactions and internal-force diagrams.Benchmark tested · 22/22 · Benchmark reportEN UA DE NL FR ES PL
  • Stress Transformation & Mohr CircleTransform 2D and full 3D stress, engineering load cases or strain rosettes, and explore Mohr–Coulomb effective stress with pore-pressure translation.Benchmark tested · 136/136 · Benchmark reportEN UA DE NL FR ES PL
  • 2D Frame / FEM WorkbenchBuild planar beam-column frames and run linear static, initial-stress P–Δ second-order, undamped modal or eigenvalue-buckling FEM: supports, springs, loads and combinations, reactions, deflections, N/V/M diagrams, natural frequencies, mode shapes and critical load factors.Benchmark tested · 41/41 · Benchmark reportEN UA DE NL FR ES PL
  • Debris Runout StudioBuild terrain, shell/wall geometry and mitigation, release shaped debris, model fragmentation, and map 2.5D Monte Carlo transit, landing, energy and runout hazard.Prototype · Benchmark reportEN UA DE NL FR ES PL

Physics & Mathematics 2

Materials & Chemistry 3

Validation register · Disclaimer · Sitemap